Index of ftp://ftpdoe.water.ca.gov/DV_Dam_Bulkhead/specifications/

[DIR] Parent Directory

-15 -14 -13 -12 -11 -10 -09 -08 -07 -06 -05 -04 -03 -02 -01   page 02 of 02
+01 +02 +03 +04 +05 +06 +07 +08 +09 +10 +11 +12 +13 +14 +15   <- Back | Next page ->

[TXT] 00620 Payment Bond.doc  29.00Kb  July 12 2012
[TXT] 00800 Supplementary Gen. Con. (T&M).doc  34.00Kb  July 12 2012
[TXT] 00901 Addenda.doc  24.00Kb  July 12 2012
[TXT] 00902 Info Letters.doc  23.00Kb  July 12 2012
[TXT] 01110 Summary of Work (T&M).doc  50.00Kb  July 12 2012
[TXT] 01310 Project Meeting.doc  32.00Kb  July 12 2012
[   ] 01321 Contractor's Schedule.docx  22.47Kb  July 12 2012
[TXT] 01330 Submittals (with Register).doc  101.50Kb  July 12 2012
[TXT] 01521 Department Furnished Facilities.doc  27.00Kb  July 12 2012
[TXT] 01550 Right of Way and Access Restrictions.doc  33.00Kb  July 12 2012
[TXT] 01570 Environmental Protection.doc  50.50Kb  July 12 2012
[TXT] 02200 Time and Materials (T&M).doc  57.50Kb  July 12 2012
[   ] 03932 Crack Repair.docx  21.41Kb  July 12 2012
[TXT] 05000 Materials and Workmanship.doc  131.50Kb  July 12 2012
[TXT] 09910 Painting.doc  34.00Kb  July 12 2012
[TXT] 09970 Coatings.doc  55.00Kb  July 12 2012
[TXT] 15051 Install-Remove Dept Furn'd Equip & Matls.doc  70.50Kb  July 12 2012
[TXT] Appendix I, page 1 (T&M).doc  35.50Kb  July 12 2012
[TXT] Appendix I, page 2 (T&M).xls  33.50Kb  July 12 2012
[TXT] Appendix I, page 3 (T&M).doc  23.50Kb  July 12 2012
[TXT] Appendix III Daily Coating Inspection Report.doc  65.50Kb  July 12 2012
[TXT] Appendix IV Design Engineer's Criteria for Operation and Maintence.pdf  2.14Mb  July 12 2012
[TXT] Appendix V WREM 55b.pdf  147.16Kb  July 12 2012
[TXT] Construction Memo.doc  25.50Kb  July 12 2012
[TXT] INFO.doc  30.50Kb  July 12 2012

-15 -14 -13 -12 -11 -10 -09 -08 -07 -06 -05 -04 -03 -02 -01   page 02 of 02
+01 +02 +03 +04 +05 +06 +07 +08 +09 +10 +11 +12 +13 +14 +15   <- Back | Next page ->