Index of ftp://ftpdoe.water.ca.gov/Specs/Spec-14-03/Engineering

[DIR] Parent Directory

[TXT] Blasting - 2014-02-27 by Revey.pdf  3.04Mb  April 14 2014 at 11:58
[TXT] Cement Deep Soil Mixing Test Section - 2011-01.pdf  25.91Mb  April 14 2014 at 11:58
[TXT] Chemical Analyses Quarry Samples - 2013-08-29.pdf  150.67Kb  April 14 2014 at 11:58
[TXT] Dewatering Excavation Test Section - 2011-02.pdf  40.26Mb  April 14 2014 at 11:59
[TXT] Final Construction Report - 1974-04.pdf  45.86Mb  April 14 2014 at 11:58
[TXT] Final Design Report - Draft - 1975-07.pdf  58.81Mb  April 14 2014 at 11:59
[DIR] Perris Dam Foundation Study 2005  0.00b  March 4 2014 at 16:17
[   ] Read me Engineering Reports.docx  24.76Kb  April 14 2014 at 15:05
[TXT] Rock Processing - 2014-02-19 by Stelzner.pdf  344.42Kb  April 14 2014 at 11:58
[TXT] Shear Wave Velocity 2007-10-8 by GeoVision.pdf  4.25Mb  April 14 2014 at 11:58
[TXT] Undisturbed Soil Sampling and Testing - 2011-04.pdf  35.16Mb  April 14 2014 at 11:58