Index of ftp://ftp.pppl.gov/pub/IVC Weekly Status Meetings/14-01-09 Manufacturing

[DIR] Parent Directory

[   ] Manufacturing Status of MID ELM Coil Prototype(20140109)123.pptx  3.29Mb  January 10 2014
[TXT] R&D of the Bracket Brazing to SSMIC for ITER in-vessel Coil.pdf  3.47Mb  January 10 2014
[TXT] The Preliminary Design and Procedure specification for Bracket Brazing to SSMIC of ITER Mid ELM Coil.pdf  1.06Mb  January 10 2014
[TXT] The Preliminary Design and Procedure specification for Bracket Brazing to SSMIC of ITER 120 C Upper VS Coil.pdf  541.21Kb  January 10 2014