Index of ftp://ftp.pppl.gov/pub/IVC Weekly Status Meetings/13-09-26 Manufacturing
Parent Directory
Metrology for Concave Surfaces of the VS Spine_01.ppt
4.00Mb
September 26 2013
Teak test on the inlet part patch.ppt
370.50Kb
September 26 2013
The progress of forming experiment of ELM and VS prototype coil in recent weeks.pptx
525.22Kb
September 26 2013
The R&D of 1.5 m long prototype spine brazing to SSMIC of ITER 120 C Upper VS coil.doc
720.50Kb
September 26 2013
the stress relief test for ELM sample by the method of heat treatment.ppt
4.47Mb
September 26 2013