Index of ftp://ftp.pppl.gov/pub/IVC Weekly Status Meetings/13-09-26 Manufacturing

[DIR] Parent Directory

[   ] Metrology for Concave Surfaces of the VS Spine_01.ppt  4.00Mb  September 26 2013
[   ] Teak test on the inlet part patch.ppt  370.50Kb  September 26 2013
[   ] The progress of forming experiment of ELM and VS prototype coil in recent weeks.pptx  525.22Kb  September 26 2013
[TXT] The R&D of 1.5 m long prototype spine brazing to SSMIC of ITER 120 C Upper VS coil.doc  720.50Kb  September 26 2013
[   ] the stress relief test for ELM sample by the method of heat treatment.ppt  4.47Mb  September 26 2013