Index of ftp://ftp.pppl.gov/pub/IVC Weekly Status Meetings/13-08-22 Manufacturing
Parent Directory
120°Upper VS Coil bending R&D.docx
12.12Mb
August 22 2013
[
find mirrors
]
120°Upper VS Coil bending R&D.pdf
1.71Mb
August 22 2013
[
find mirrors
]
Analysis Report Discusson.ppt
376.00Kb
August 21 2013
[
find mirrors
]
Prepared electrical tests for the ELM and VS Prototype coils.ppt
2.22Mb
August 22 2013
[
find mirrors
]
The Drawing of the Prototype ELM coil and VS coil on Enovia.ppt
405.00Kb
August 22 2013
[
find mirrors
]
The forming report for the 2,3,6,7,9 segments of 120°UPPER VS Coil.pdf
3.35Mb
August 22 2013
[
find mirrors
]
The forming report for the 2,3,6,7,9 segments of 120°UPPER VS Coil.pptx
9.03Mb
August 22 2013
[
find mirrors
]
The manufacture progress of Inconel625 bracket.ppt
1.69Mb
August 22 2013
[
find mirrors
]