Index of ftp://ftp.pppl.gov/pub/IVC Weekly Status Meetings/13-08-22 Manufacturing

[DIR] Parent Directory

[   ] 120°Upper VS Coil bending R&D.docx  12.12Mb  August 22 2013
[TXT] 120°Upper VS Coil bending R&D.pdf  1.71Mb  August 22 2013
[   ] Analysis Report Discusson.ppt  376.00Kb  August 21 2013
[   ] Prepared electrical tests for the ELM and VS Prototype coils.ppt  2.22Mb  August 22 2013
[   ] The Drawing of the Prototype ELM coil and VS coil on Enovia.ppt  405.00Kb  August 22 2013
[TXT] The forming report for the 2,3,6,7,9 segments of 120°UPPER VS Coil.pdf  3.35Mb  August 22 2013
[   ] The forming report for the 2,3,6,7,9 segments of 120°UPPER VS Coil.pptx  9.03Mb  August 22 2013
[   ] The manufacture progress of Inconel625 bracket.ppt  1.69Mb  August 22 2013