Index of ftp://ftp.pppl.gov/pub/IVC Weekly Status Meetings/12-04-19

[DIR] Parent Directory

[   ] ASIPP Mechanical testing for the ELM and VS conductor .ppt  1.35Mb  April 18 2012
[TXT] ITER IVC SSMIC ELM Specification 11-11-22.doc  893.00Kb  April 18 2012
[   ] Manufacturing R&D Priority Discussion 12-04-19.ppt  1.33Mb  April 18 2012
[   ] NDT Questions.ppt  749.00Kb  April 20 2012
[   ] PPPL Mechanical Testing.ppt  4.23Mb  April 17 2012
[   ] SSMIC Specification ASIPP Modifications.ppt  1.36Mb  April 20 2012
[   ] The progress of welding for 316L SS and other issues.ppt  4.35Mb  April 20 2012
[BIN] Thumbs.db  32.50Kb  April 18 2012
[TXT] VS SPINE CONNECTION JOINT ASSEMBALY SEQUENCE1 (1).pdf  2.80Mb  April 18 2012