Index of ftp://ftp.pppl.gov/pub/ITER Port Plug Engineering/SEPT_2015_TEAM_MEETING

[DIR] Parent Directory

[   ] 2015SEP Diagnostic Group Meeting - EP09 Update.pptx  2.16Mb  September 16 2015
[TXT] 2015SEPT10_DIAGNOSTICS_TEAM_MEETING.pdf  2.43Mb  September 10 2015
[   ] EPP0 DSM2 ECE Design Evolution (1).pptx  3.03Mb  September 16 2015
[   ] ITER Team Meeting 09102015.pptx  1.85Mb  September 17 2015
[   ] ITER Team Meeting-Upper Port Updates.pptx  2.77Mb  September 16 2015
[TXT] PPPL Mail - SDDR at the closure plate of EqP9.pdf  903.58Kb  September 16 2015
[   ] USITER_IaC_Integ_Activities v5.pptx  1.26Mb  September 9 2015
[   ] WAVS status meeting 9102015.pptx  5.81Mb  September 16 2015
[   ] impact of new gaps from DIN on UPP#14.pptx  1.13Mb  September 16 2015