Index of ftp://ftp.portlc.com/Engineering FTP/Environmental Pit/Contractor's AsBuilt

[DIR] Parent Directory

[   ] 20 PIPE DIMS.dwg  29.54Kb  November 7 2004 at 02:51
[   ] 24 HDPE CONFLICT.dwg  56.37Kb  November 30 2004 at 17:12
[   ] 24 PIPE DIMS.dwg  30.37Kb  November 7 2004 at 02:51
[   ] ALL WORKING DRAWINGS.dwg  416.94Kb  December 1 2004 at 15:05
[   ] arch pipe asbuilt.dwg  230.18Kb  November 7 2004 at 02:51
[   ] AS BUILT DWGS.dwg  120.42Kb  November 7 2004 at 02:51
[   ] AS-BUILT DUSTY113004.dwg  84.46Kb  November 30 2004 at 17:12
[   ] Copy of C-6-water relocation.dwg  99.05Kb  November 7 2004 at 02:51
[   ] Copy of dustypit1.dwg  886.51Kb  November 7 2004 at 02:51
[   ] CORRECTED SUMP LOCATIONS.dwg  131.01Kb  November 7 2004 at 02:51
[   ] DRAIN PIPE@ PIT 2.dwg  28.82Kb  November 7 2004 at 02:51
[   ] DUCT BANK XINGS.dwg  49.92Kb  November 7 2004 at 02:51
[   ] dustypit1.dwg  634.80Kb  November 7 2004 at 02:51
[   ] elec duct bank asbuilt.dwg  880.60Kb  November 7 2004 at 02:51
[   ] EXCAVATION LAYOUT.dwg  45.32Kb  November 7 2004 at 02:51
[   ] FENCE DIMENSIONS.dwg  33.54Kb  November 7 2004 at 02:51
[   ] pavement break out.dwg  44.33Kb  November 7 2004 at 02:51
[   ] PILE LAYOUT PUMP STA 2.dwg  44.00Kb  November 7 2004 at 02:51
[   ] pipe tie ins.dwg  26.11Kb  November 7 2004 at 02:51
[   ] PIPEASBUILTS12232003.dwg  93.87Kb  November 7 2004 at 02:51
[   ] PIT 1 POINTS.dwg  46.68Kb  November 7 2004 at 02:51
[   ] RE ROUTE 24 HDPE.dwg  308.54Kb  November 7 2004 at 02:51