Index of ftp://ftp.portlc.com/Engineering FTP/Environmental Pit/Contractor's AsBuilt
Parent Directory
20 PIPE DIMS.dwg
29.54Kb
November 7 2004 at 02:51
24 HDPE CONFLICT.dwg
56.37Kb
November 30 2004 at 17:12
24 PIPE DIMS.dwg
30.37Kb
November 7 2004 at 02:51
ALL WORKING DRAWINGS.dwg
416.94Kb
December 1 2004 at 15:05
arch pipe asbuilt.dwg
230.18Kb
November 7 2004 at 02:51
AS BUILT DWGS.dwg
120.42Kb
November 7 2004 at 02:51
AS-BUILT DUSTY113004.dwg
84.46Kb
November 30 2004 at 17:12
Copy of C-6-water relocation.dwg
99.05Kb
November 7 2004 at 02:51
Copy of dustypit1.dwg
886.51Kb
November 7 2004 at 02:51
CORRECTED SUMP LOCATIONS.dwg
131.01Kb
November 7 2004 at 02:51
DRAIN PIPE@ PIT 2.dwg
28.82Kb
November 7 2004 at 02:51
DUCT BANK XINGS.dwg
49.92Kb
November 7 2004 at 02:51
dustypit1.dwg
634.80Kb
November 7 2004 at 02:51
elec duct bank asbuilt.dwg
880.60Kb
November 7 2004 at 02:51
EXCAVATION LAYOUT.dwg
45.32Kb
November 7 2004 at 02:51
FENCE DIMENSIONS.dwg
33.54Kb
November 7 2004 at 02:51
pavement break out.dwg
44.33Kb
November 7 2004 at 02:51
PILE LAYOUT PUMP STA 2.dwg
44.00Kb
November 7 2004 at 02:51
pipe tie ins.dwg
26.11Kb
November 7 2004 at 02:51
PIPEASBUILTS12232003.dwg
93.87Kb
November 7 2004 at 02:51
PIT 1 POINTS.dwg
46.68Kb
November 7 2004 at 02:51
RE ROUTE 24 HDPE.dwg
308.54Kb
November 7 2004 at 02:51