Index of ftp://ftp.dot.wi.gov/dtsd/sw-region/US 12 Baraboo Public Record Request

[DIR] Parent Directory

-15 -14 -13 -12 -11 -10 -09 -08 -07 -06 -05 -04 -03 -02 -01   page 01 of 05
+01 +02 +03 +04 +05 +06 +07 +08 +09 +10 +11 +12 +13 +14 +15   <- Back | Next page ->

[TXT] 2-6-13 PIM Presentation.pdf  4.37Mb  August 29 2017
[TXT] Aesthetics on US 12 Bypass Structures (South Section).msg  61.00Kb  August 29 2017
[TXT] August222017CSSOpenRecordsRequestDocumentation.pdf  34.39Mb  August 29 2017
[TXT] BudgetDocumentationforAugust222017CSSOpenRecordsRequest.pdf  968.65Kb  August 29 2017
[TXT] Contacting the Town of Baraboo.msg  48.00Kb  August 29 2017
[TXT] Details.msg  1.08Mb  August 29 2017
[TXT] DRAFT Presentation for 8 1 meeting.msg  3.60Mb  August 29 2017
[TXT] Final Confirmation of US 12 Structures Aesthetics.msg  1.39Mb  August 29 2017
[TXT] Formliner for US 12 structures.msg  62.50Kb  August 29 2017
[TXT] Formliners for US 12 structures.msg  1.23Mb  August 29 2017
[TXT] FW Architectural Surface Treatment.msg  62.00Kb  August 29 2017
[TXT] FW Epoxy Coated Aggregate US 12 North Section SPV.msg  68.00Kb  August 29 2017
[TXT] FW Final Confirmation of US 12 Structures Aesthetics.msg  78.50Kb  August 29 2017
[TXT] FW Formliners for US 12 structures (53).msg  1.80Mb  August 29 2017
[TXT] FW Formliners for US 12 structures.msg  68.00Kb  August 29 2017
[TXT] FW Public Records Request 1674-00-81 1674-00-84 Highway 12 Baraboo bypass.msg  422.00Kb  August 29 2017
[TXT] FW Redi Rock Retaining Wall.msg  164.50Kb  August 29 2017
[TXT] FW Status of Aesthetics Decisions on US 12 Bypass Structures (South Section).msg  39.00Kb  August 29 2017
[TXT] FW Structures Coordination - US 12.msg  5.95Mb  August 29 2017
[TXT] FW US 12 CSD Meeting #2 Follow-up Coordination.msg  1.47Mb  August 29 2017
[TXT] FW US 12 South Section Additional Design Decisions.msg  122.50Kb  August 29 2017
[TXT] FW US 12 South Section Bypass - CSD.msg  1.32Mb  August 29 2017
[TXT] FW US 12 South Section Updated Bridge Elevations (14).msg  1.25Mb  August 29 2017
[TXT] FW US 12 South Section Updated Bridge Elevations (19).msg  3.15Mb  August 29 2017
[TXT] FW US 12 South Section Updated Bridge Elevations.msg  1.26Mb  August 29 2017
[TXT] RE 1st CSD Mtg w local officials - Availability.msg  70.00Kb  August 29 2017
[TXT] RE Aesthetic costs.msg  46.50Kb  August 29 2017
[TXT] RE Architectural Surface Treatment.msg  1.11Mb  August 29 2017
[TXT] RE DRAFT Presentation for 8 1 meeting (57).msg  4.15Mb  August 29 2017
[TXT] RE DRAFT Presentation for 8 1 meeting.msg  86.00Kb  August 29 2017

-15 -14 -13 -12 -11 -10 -09 -08 -07 -06 -05 -04 -03 -02 -01   page 01 of 05
+01 +02 +03 +04 +05 +06 +07 +08 +09 +10 +11 +12 +13 +14 +15   <- Back | Next page ->