1 CDN raw water pump waiting for installation.jpg | 1.73Mb | November 29 2011 at 22:58 |
1 hdpe piping.jpg | 1.83Mb | November 29 2011 at 22:58 |
1 raw water intake pumping station SB (exististing) and CDN (in progress).jpg | 1.44Mb | November 29 2011 at 22:58 |
1 raw water intake pumping, 3 pumps, in progress.jpg | 1.14Mb | November 29 2011 at 22:58 |
1 raw water pump motor.jpg | 1.10Mb | November 29 2011 at 22:58 |
1 raw water pump.jpg | 989.56Kb | November 29 2011 at 22:58 |
1 raw water pumping station for CDO and CDN.jpg | 1.38Mb | November 29 2011 at 22:58 |
1 suction screens, to be installed.jpg | 1.93Mb | November 29 2011 at 22:58 |
4 clarifyed water to filtration.jpg | 970.03Kb | November 29 2011 at 22:58 |
4 sedimenation desludging hand and automated, electric actuated.jpg | 1.38Mb | November 29 2011 at 22:58 |
4 sedimentation hexagon lamella 30 mm.jpg | 1.22Mb | November 29 2011 at 22:58 |
5 backwash blower, 1 of 2.jpg | 1.28Mb | November 29 2011 at 22:58 |
5 filter gallery 2.jpg | 1.55Mb | November 29 2011 at 22:58 |
5 filter gallery 3.jpg | 1.09Mb | November 29 2011 at 22:58 |
5 filter gallery.jpg | 1.44Mb | November 29 2011 at 22:58 |
5 filter units, 12 total, automated valves and level control.jpg | 1.20Mb | November 29 2011 at 22:58 |
5 filter units, 12 total.jpg | 1.14Mb | November 29 2011 at 22:58 |
5 filter, 1 of 12.jpg | 1.05Mb | November 29 2011 at 22:58 |
5,9 filter control panel, automated.jpg | 1.09Mb | November 29 2011 at 22:58 |
8 clear water pumping station, common CDN and CDO.jpg | 1.79Mb | November 29 2011 at 22:58 |